16/01/2025

T&T Group simultaneously inaugurated and started construction of key projects in Long An

A series of transport infrastructure projects and educational facilities in Long An have been inaugurated and put into operation by T&T Group, contributing to promoting the local socio-economic development, so that Long An is ready to join the country in entering a new era - the era of national growth.

December 15, 1, Provincial People's Committee Long An cooperated with T&T Group to organize the inauguration ceremony of Provincial Road 826E (Hamlet 3 Long Hau) from DT.826C to the edge of Long Hau asphalt road. On this occasion, the Group ftp extension also held a groundbreaking ceremony for the FPT Long An Inter-level School project belonging to the Long Hau Commercial Area, Villas and Luxury Apartments Project (T&T City Millennia) of T&T Group. On the same day, Thai Son - Long An Joint Stock Company (a member of T&T Group) officially inaugurated the Kindergarten and Primary School project in the Thai Son Resettlement Area (Long Hau Commune, Can Giuoc District, Long An Province).

Delegates performed the ribbon-cutting ceremony to inaugurate Provincial Road 826E (Hamlet 3 Long Hau) from Provincial Road 826C to the edge of Long Hau asphalt road.

These meaningful projects not only solve the problem of traffic and urban infrastructure, education, but also contributes significantly to improving the quality of life, promoting economic restructuring and building Long An into a bright spot on the socio-economic development map of Vietnam.

From Provincial Road 826E – a bridge and driving force for economic development

Provincial Road 826E Project (Hamlet 3 Long Hau) from DT.826C to the edge of Long Hau asphalt road is one of the breakthrough traffic projects of Long An province, designed according to urban main street standards with a scale of 6 lanes, a design speed of 60 km/h and green trees and lighting system along the entire route. This project is more than 2,7 km long with a total estimated cost of more than 389 billion VND, with 4 enterprises contributing capital, of which Thai Son - Long An Joint Stock Company contributes the most capital with nearly 72% of the total estimated value.

Provincial Road 826E (Hamlet 3 Long Hau) from DT.826C to the edge of Long Hau asphalt road has officially opened to traffic and put into use.

Officially started in June 6, the project has been completed on schedule and put into use before Lunar New Year 2022.

Speaking at the ceremony, Mr. Do Quang Hien, Founder and Executive Chairman of T&T Group said: “The completion and operation of Provincial Road 826E will contribute to improving the local transport infrastructure system, increasing connectivity between industrial parks and urban industrial clusters, creating a premise to attract investors, promoting economic restructuring, increasing state budget revenue and accelerating the socio-economic development of the province. At the same time, the project will contribute to creating favorable conditions for people in production, business, trade and service activities, increasing income”.

Mr. Do Quang Hien, Founder and Executive Chairman of T&T Group spoke at the event.

“In the future, this route will connect with National Highway 50, the dynamic axis of National Highway 50B, Long Hau Industrial Park, Nguyen Van Tao Street (Nha Be District, Ho Chi Minh City); and at the same time connect with Tan Tap - Long Hau Street to Long An International Port and Hiep Phuoc Industrial Park (Ho Chi Minh City)”, Mr. Do Quang Hien added.

Long An provincial leaders and business representatives performed a connection ceremony, demonstrating their commitment, companionship and joining hands to build a prosperous and sustainable Long An in the future.

Mr. Nguyen Van Ut, Deputy Secretary of the Provincial Party Committee, Chairman of the People's Committee of Long An province said that although it is only a very short section, Provincial Road 826E (Hamlet 3 Long Hau) from DT.826C to the edge of Long Hau asphalt road is very important, connecting industrial parks and urban areas. “This is also one of the projects in which the contribution of businesses is very large. We are very happy that businesses have come to Long An, accompanied Long An and made many contributions to Long An in recent times," Mr. Nguyen Van Ut emphasized.

To educational projects investing in the future

Also within the framework of the event, FPT Long An Inter-level School under the T&T City Millennia project officially broke ground for construction. This is the result of an important cooperation between T&T Group and FPT Corporation to invest, build and create a modern, experiential learning environment, mastering technological skills for the next generation.

FPT Long An Inter-level School at T&T City Millennia also officially broke ground for construction.

Accordingly, FPT Long An Inter-level School is built on an area of ​​about 2,54 hectares, with a modern planning with two 5-storey lecture halls, a multi-purpose service building and other auxiliary items, meeting the learning needs of more than 2.500 students of primary, secondary and high schools. In the future, this will be one of the leading modern schools in Long An province, with spacious facilities, fully equipped with modern educational equipment; promising to become a place to train generations of high-quality students, meeting the human resource development requirements of the province and the whole region.

In addition, also on January 15, Thai Son - Long An Joint Stock Company officially inaugurated the kindergarten and primary school in Thai Son Resettlement Area - a project with a scale of more than 1 hectares, adjacent to the T&T City Millennia project and fully inheriting the infrastructure and synchronous utilities of the metropolis. The total construction value of the two schools is nearly 46 billion VND, from the investment capital of Thai Son - Long An Joint Stock Company.

Panoramic view of Thai Son resettlement area kindergarten and primary school.

In the context of Long Hau commune, Can Giuoc district lacking infrastructure for preschool and primary education, the inauguration and operation of these projects have important significance; both solving the urgent problem with the ability to meet the learning needs of nearly 1.000 local students, and contributing to completing and changing the appearance of Thai Son Resettlement Area, creating favorable conditions for people to live stably and long-term. “Investing in building schools in the Thai Son resettlement area is an inevitable and necessary step to solve this problem.”, Mr. Huynh Minh Tri, Vice Chairman of Can Giuoc District People's Committee emphasized.

“These will also be symbolic projects for the vision of sustainable development and the spirit of social responsibility of T&T Group and FPT Corporation in the cause of educational development, nurturing promising future generations of the country in general and Long An in particular.”, representative of T&T Group said.

And enhance the value of the metropolis T&T City Millennia

The inauguration of provincial road 826E (Hamlet 3 Long Hau) from DT.826C to the edge of Long Hau asphalt road and the construction of FPT Long An inter-level high school have a huge impact on T&T City Millennia - a key project of T&T Group deployed in Long An province, with the desire to create a millennium city with the appearance of modern international metropolises.

Provincial Road 826E (Hamlet 3 Long Hau) from DT.826C to the edge of Long Hau asphalt road, inaugurated and put into operation, will bring a new look to the traffic infrastructure of the suburban area, creating favorable conditions for inter-regional travel and connection. Meanwhile, the continued implementation of internal utility projects - typically FPT Long An inter-level school - will gradually realize T&T Group's goal of creating a comprehensive living environment at T&T City Millennia. This will also be the driving force for the T&T City Millennia project to attract more customers and investors with the desire to find a quality living space; meeting the needs of living, studying, working, playing, entertaining and shopping; while opening up opportunities to increase sustainable real estate value.

T&T City Millennia promises to become a livable urban area.

T&T City Millennia has a scale of 267 hectares, planned and designed based on the heroic and intense historical inspiration of Can Giuoc land like bright and vibrant lotus flowers; based on the harmony of natural flows, cultural flows, historical flows and people, combined with the quintessence from the river regions above. world such as Venice - Italy, Garden by the Bay - Singapore. In addition, T&T City Millennia is formed and connected by the East-West cultural axis and the North-South lifestyle axis with the integration of local culture into a trendy, elegant lifestyle. The project is divided into 4 phases with 12 subdivisions with 3 main architectural styles: Modern Asia - Vietnamese identity - European architecture. Accordingly, phase 1 of the project was officially inaugurated in October 10.

With a commitment to ensuring that the community enjoys a classy living space with professional and worthy services, in March 3, Thai Son - Long An Joint Stock Company (a member of T&T Group - the project developer) signed a cooperation agreement with a leading Japanese partner - Anabuki Group to manage and operate this project.

T&T Group always accompanies localities in social security work, including Long An province.
Share: